The grid connection is usually the longest lead time and often the largest cost. There are ways around it, and they can be combined.

Last reviewed:

Side by side

Options

OptionTime to powerFits whenWatch out for
Bigger grid connectionLongest: transformer, permits, the operator's scheduleDaily energy far exceeds what the current connection can deliver overnightPower-based fees on the new peak
Managed charging on the existing connectionShortestVehicles stay long enough at the depot (vans overnight)Needs a measurement of the site's load first
Battery bufferMediumShort, high-power sessions (trucks) on a modest connection; solar on siteSizing: the battery must refill between sessions
WattsMobi containerDaysWhile the upgrade is pending, for pilots, temporary depotsLogistics of refilling if used off-grid

Example: a WattsFuture reference depot with a 55 kW connection delivered 124 kW of charging with a battery in front. Fleet Studio sizes the combination on your own trips.