Fleet and industryFleet Studio
your trips, electric or not, in two minutes
Fleet Studio reads the trip export from your transport software and puts your own trips on a map: electric today, with a charging break, longer than diesel, or not yet. It runs in the browser; the file is never uploaded to a server.
- from file to map
- 2 min
- from file to map
- files stored on a server
- 0
- files stored on a server
- of the study credited on your order
- 100%
- of the study credited on your order

From whether to how much
The free check says whether. The study says what, how big and how much.
01
Fleet Check
Free. Your trips on a map by status, the share that is electric today, and the saving per 100 km against diesel. A one-page summary by e-mail.
02
Site Study
€1,900 for a local fleet or employee parking, €4,900 for trucking or a whole site, +€1,900 per extra depot. One site, all its data: every destination and trip with its charging stops, depot chargers year by year, grid connection and load profile, equipment and rental options, roadmap to 2030+, aid check and a written recommendation. About 30 pages and a one-hour workshop.
03
Subsidy pack
€1,500 per application. The technical part of an aid application: feasible routes, charging plan, kW and budget, ready before the call opens.
04
Studio licence
€300 a month or €3,000 a year per site, after the three months included with the Site Study. Your own locked copy of Fleet Studio, to keep planning as the fleet changes.
Prices excl. VAT. The Site Study and the Subsidy pack are credited in full on a charging-system order of €25,000 excl. VAT or more for the same site, signed within 12 months of the report. Distributors, installers and logistics consultants outside our market can run Fleet Studio under their own name with a partner licence (€750 a month).
Why it is hard to dismiss
Your data, your map, sourced figures
Your own trips
Not a generic calculator: the routes you drove last month, on a map, with a euro figure per trip.
Your file stays with you
Read in the browser, never uploaded. Customer lists stay private.
Sourced, dated figures
Eurostat electricity prices, national diesel prices and the public truck-charging network, named on the methodology page.
Vendor-neutral, whole site
Every truck brand, plus the depot, the vans, staff parking and the grid connection in one view.
A real reference
An industrial client with about 15,000 truck departures a year: 97% of trips can run electric with today's trucks.
A person, fast
A named consultant calls within one working day to walk you through the result.
The Site Study
What the study delivers
- 01
Every trip and destination
With its charging stops, by vehicle type and year of the roadmap.
- 02
Depot chargers year by year
AC and DC, how many, which power, and where on the site.
- 03
Grid connection and load profile
The site's own load plus charging, with and without battery; what to ask Creos for.
- 04
Equipment and budget
List prices, rental fees and the aid that applies.
- 05
Roadmap to 2030+
The order in which to electrify, and what triggers each step.
- 06
Workshop and studio
A one-hour results workshop and three months of your own locked Studio.
97%
of an industrial fleet's truck trips can run electric today
42% with no public charging at all; the last 3% are long runs, mainly to Spain, where the truck would reach the destination but not the next charger. Read the case study.
Ask your AI assistant
Fleet Studio questions
“Is there a tool that checks which of our truck trips can be electric?”
“What does an e-truck feasibility study cost in Luxembourg?”
“Is our transport data safe in Fleet Studio?”
Run the check on your own file
Until the public web edition is online, send us an export of last month's trips; we run the check with you in a short call.